EUDR Due Diligence Statement for Coffee Imports
An EUDR Due Diligence Statement for coffee imports is the electronic declaration submitted by the responsible operator after completing due diligence and before the relevant coffee is released for free circulation in the European Union. The statement confirms that the operator assessed the coffee against the EU Deforestation Regulation, found no risk or only a negligible risk of non-compliance and accepts responsibility for the accuracy of the declaration and the compliance of the product. It is not a substitute for farm records, geolocation, legal-production evidence or risk analysis. It is the formal result of the due diligence process supported by those records.
For imported coffee, the Due Diligence Statement, commonly abbreviated as DDS, must be submitted through the EUDR Information System early enough for its reference number to be included in the customs declaration. A shipment should therefore not arrive at the customs-clearance stage while the importer is still trying to identify farms, collect coordinates or reconstruct lot movements. The origin data, compliance evidence and risk conclusion must already be complete and internally approved.
What is an EUDR Due Diligence Statement?
The DDS is an electronic statement through which the operator declares that due diligence has been exercised in accordance with the EUDR and that no or only a negligible risk was found that the relevant products fail to meet the Regulation’s deforestation-free and legal-production conditions.
For coffee imports, the statement connects the imported product with:
- The EU operator responsible for placing it on the market
- The relevant customs classification
- The commercial product description
- The quantity covered
- The country of production
- Every production plot contributing to the coffee
- The completed due diligence assessment
- The customs declaration and import shipment
Submitting a DDS does not mean that the European Commission or the Information System has approved the coffee. The operator remains responsible for the declaration and must be able to provide the complete supporting file to competent authorities.
Who submits the DDS for imported coffee?
The main responsibility normally belongs to the first operator established in the European Union that places the imported coffee on the EU market under the customs procedure for release for free circulation. In many transactions, this is the EU importer named in the commercial and customs documentation.
The responsible party should be identified before the purchase contract is finalised. Possible participants include:
- The EU importer purchasing directly from an exporter
- An EU trading company importing on its own account
- An EU roaster importing green coffee directly
- An EU manufacturer importing roasted or processed coffee
- An authorised representative acting within the limits permitted by the Regulation
- A customs representative lodging the customs declaration without becoming the EUDR operator
A freight forwarder, shipping agent or customs broker does not automatically become the operator merely because it handles logistics or files a customs declaration. The commercial role, ownership or equivalent rights, contractual structure and customs procedure must be reviewed to identify the actual operator.
Role of the non-EU coffee exporter
A Vietnamese or other non-EU exporter generally does not submit the EU import DDS solely because it produced or shipped the coffee. However, the exporter must provide the information and evidence the EU operator needs to complete due diligence.
The exporter’s data package may include:
- Farmer, farm and plot registers
- Plot coordinates or polygons
- Production and harvest periods
- Land-use and legal-production evidence
- Deforestation-screening results
- Collection and processing records
- Lot-composition records
- Quantity reconciliations
- Warehouse and container records
- Commercial invoice and packing list data
If the exporter cannot provide reliable plot-level information, the importer may be unable to reach a negligible-risk conclusion and therefore may be unable to submit a valid DDS for the shipment.
When must the statement be submitted?
The due diligence process must be completed and the DDS submitted before the relevant coffee is placed on the EU market. For imported goods, the DDS reference number must be available before the customs declaration for release for free circulation is lodged.
The practical sequence is:
- The importer confirms that the product falls within the EUDR scope.
- The origin supply chain and all contributing production plots are identified.
- Required information and supporting evidence are collected.
- Deforestation-free and legal-production conditions are assessed.
- Risk is evaluated.
- Any non-negligible risk is mitigated.
- The final shipment quantity and lot composition are confirmed.
- The DDS is submitted through the Information System.
- The system provides a reference number.
- The customs declarant includes the required reference information in the customs declaration.
Submitting the statement after the customs declaration has already been lodged would not satisfy the required import sequence.
EUDR application dates for coffee imports
Under the current timetable, the main EUDR obligations apply from 30 December 2026 to large and medium-sized operators. For qualifying micro and small operators established within the legally defined period, the main application date is generally 30 June 2027.
| Operator category | Main application date | Import implication |
|---|---|---|
| Large and medium operators | 30 December 2026 | Relevant coffee imports must be covered by completed due diligence and the required DDS before customs clearance. |
| Qualifying micro and small operators | 30 June 2027 | A later date generally applies, but supplier mapping, geolocation and data systems should be prepared in advance. |
The application date is different from the deforestation cut-off date. The application date determines when the legal obligations apply to the operator. The cut-off date of 31 December 2020 determines whether the production land can qualify as deforestation-free.
Which coffee imports require a DDS?
The requirement depends on whether the imported product is listed in the applicable version of EUDR Annex I under its customs classification. The commercial name on the invoice is not sufficient for determining scope.
Products requiring classification review include:
- Green coffee beans
- Roasted coffee beans
- Ground roasted coffee
- Decaffeinated coffee
- Soluble or instant coffee
- Coffee extracts and concentrates
- Three-in-one coffee
- Composite products containing coffee
- Samples intended for sale, testing or analysis
The importer should confirm the exact HS or Combined Nomenclature code, the product composition, the customs procedure, the date of import and the version of Annex I applicable at that time.
Information required in the DDS
The statement contains the information prescribed by the EUDR and its electronic system. For a coffee import, the core fields include:
- Operator’s legal name
- Operator’s address
- EORI number for products entering the EU market
- HS code
- Free-text product description and trade name
- Quantity covered by the statement
- Country of production
- Geolocation of all production plots
- The prescribed confirmation that due diligence was completed and no or only negligible risk was found
- Date, name, function and signature information of the person acting for the operator
The information in the DDS must be supported by the operator’s internal due diligence file. A technically complete form does not create compliance when the underlying evidence is missing or unreliable.
Operator identity and EORI number
The name and address in the DDS should match the legal entity acting as the operator. For imported coffee, the operator’s EORI number must also be connected with its registration profile and customs activity.
Common identity problems include:
- Using a group name instead of the importing legal entity
- Using the exporter’s details in place of the EU operator
- Entering an EORI number belonging to another group company
- Using different legal names in the DDS and customs declaration
- Failing to update the Information System after a legal-entity change
The importer, customs broker and compliance team should agree on the exact legal-entity data before the statement is submitted.
HS code and product description
The product classification in the DDS should match the classification used in customs documentation. The free-text description should be specific enough to identify the coffee covered.
A useful description may include:
- Green, roasted, ground or processed form
- Caffeinated or decaffeinated status
- Species or blend where commercially relevant
- Origin
- Processing method
- Quality grade
- Packaging format
- Commercial lot number
Descriptions such as “food product,” “coffee material” or “agricultural goods” are too general for strong product identification. The invoice, packing list, DDS and customs declaration should describe the same product.
Quantity declared in the statement
For coffee entering the EU market, quantity is generally expressed in kilograms of net mass and, where applicable, in any supplementary unit required for the relevant customs classification.
The declared quantity should be reconciled with:
- Commercial invoice
- Packing list
- Bill of lading
- Container-loading record
- Warehouse release record
- Customs declaration
- Weight certificate where used
Normal operational tolerances should be controlled before submission. Unexplained differences between the DDS quantity and customs quantity may lead to questions, delays or the need to correct the documentation.
Country of production
The country of production is the country where the coffee commodity was grown, not the country where it was traded, stored, re-exported, roasted or packed.
For example, coffee grown in Vietnam, stored temporarily in Singapore and shipped from another port remains Vietnamese in terms of production origin. The logistics route must not replace the actual country of production.
If a product contains coffee grown in more than one country, the operator must preserve the relevant information for all contributing origins and production plots.
Geolocation of all coffee plots
The DDS must connect the coffee with all plots of land where the relevant coffee was produced. A regional coordinate, exporter’s address, cooperative office or processing-factory location cannot replace the production plots.
For smaller plots, point coordinates may be used in accordance with the applicable requirements. For plots larger than four hectares, polygon data is generally required to describe the full boundary.
The geolocation file should be linked with:
- Farmer ID
- Farm ID
- Plot ID
- Plot area
- Production period
- Delivered quantity
- Origin lot
- Final export lot
When coffee from many smallholders is combined, every contributing plot must be included. Mapping only a sample of farms does not cover the remaining coffee in the shipment.
Production date or production period
The operator’s information file must identify when the coffee was produced. Depending on the supply chain, this may be recorded as a harvest date, harvest period, crop year or another sufficiently precise production interval.
The declared period should be consistent with:
- Regional harvest calendars
- Farm harvest records
- Cherry or parchment delivery dates
- Drying and processing dates
- Warehouse intake records
- Export-lot formation
An impossible timeline, such as coffee entering a warehouse before the stated harvest, should be investigated before the DDS is submitted.
The DDS follows due diligence, not the other way around
The statement can be submitted only after due diligence has been completed. Due diligence consists of three connected stages:
- Collection of the required information and evidence
- Assessment of the risk of non-compliance
- Mitigation of any risk that is more than negligible
The importer should not prepare a conclusion first and then search for documents to support it. The risk conclusion must result from the evidence collected for the actual coffee covered by the statement.
Information collection before submitting the DDS
The supporting file should include enough information to identify the product and demonstrate compliance.
Typical records include:
- Supplier details
- Product specifications
- Country and region of production
- Farmer and plot registers
- Geolocation files
- Production periods
- Deforestation-screening evidence
- Legal-production evidence
- Lot and batch records
- Quantity reconciliations
- Processing records
- Warehouse records
- Shipping documents
Importers sourcing from several Vietnamese regions can use an understanding of Vietnam’s coffee origins and production structures to design origin-specific controls.
Assessing deforestation-free status
The operator must determine whether the coffee was produced on land that was not subject to prohibited deforestation after 31 December 2020.
Possible evidence includes:
- Historical satellite imagery
- Official forest or land-cover maps
- Historical farm registrations
- Planting records
- Earlier plot surveys
- Dated photographs
- Independent land-use assessments
Map results should be reviewed in context. Image resolution, cloud cover, shade-grown coffee, mixed farming and local land-cover characteristics can affect interpretation.
Assessing legal production
The coffee must also have been produced in accordance with the relevant legislation of the production country.
Relevant legal areas may include:
- Land-use and tenure rights
- Property and lease rights
- Environmental rules
- Forest-protection and conservation laws
- Third-party rights
- Labour requirements
- Human rights protected by applicable law
- Rights of Indigenous Peoples and local communities
- Tax and trade requirements
- Customs and anti-corruption rules
The appropriate document depends on the local legal system. A legally recognised land-use right may be valid even where the farmer does not hold a private ownership title in the form commonly used in Europe.
Risk assessment before declaration
Where full due diligence applies, the importer must assess whether the evidence indicates a risk that the coffee is not compliant.
The assessment may consider:
- Country risk classification
- Forest presence near the plots
- Regional deforestation patterns
- Reliability of geolocation
- Land-right disputes
- Document authenticity
- Supply-chain complexity
- Risk of mixing with unknown coffee
- Supplier history
- Quantity anomalies
- Substantiated concerns from third parties
The conclusion should explain why no risk or only negligible risk remains. A generic “low risk” label without analysis is not a sufficient basis for the statement.
Risk mitigation before submission
If the assessment identifies more than negligible risk, the importer must reduce that risk before submitting the DDS and importing the coffee.
Mitigation measures may include:
- Requesting missing documents
- Correcting coordinates
- Remapping plots
- Obtaining higher-resolution imagery
- Conducting field verification
- Commissioning an independent audit
- Separating uncertain farms
- Rechecking production capacity
- Suspending a supplier
- Removing an affected source from the lot
- Rejecting the shipment
If the risk cannot be reduced to a negligible level, the operator must not submit a positive DDS and proceed with placing the coffee on the market.
Low-risk countries and simplified due diligence
When all relevant coffee originates from countries or parts of countries classified as low risk and no warning information exists, simplified due diligence may be available. This reduces the standard risk-assessment and mitigation burden, but it does not remove the obligation to collect the required product, origin, geolocation, production and legal-compliance information.
A low-risk classification is not a blanket approval of every farm or lot. If the importer knows or has reason to believe that documents are false, plots are incorrectly mapped, illegal production occurred or unknown coffee was mixed into the shipment, the concern must be investigated.
Vietnamese coffee and the low-risk classification
Vietnam is currently classified as a low-risk country under the EU benchmarking system. Qualifying Vietnamese coffee imports may therefore benefit from simplified due diligence where all conditions are satisfied.
The importer must still maintain:
- Plot identification
- Geolocation
- Production-period information
- Evidence of legal production
- Evidence of deforestation-free status
- Lot-to-shipment traceability
- Accurate DDS and customs information
Low risk simplifies part of the procedure; it does not eliminate the evidence supporting the declaration.
The EUDR Information System
The DDS is submitted electronically through the EUDR Information System. The operator must be properly registered and, for imports, its EORI information must be included in the relevant profile.
The system is used to:
- Register operators and authorised representatives
- Create and submit Due Diligence Statements
- Record the products and quantities covered
- Upload or enter geolocation information
- Generate a reference number
- Retrieve existing statements
- Connect references with downstream or customs processes
Companies with high statement volumes may use available technical integration options, but automated submission does not remove the need for data validation and compliance approval.
Reference number and verification information
After submission, the Information System provides a reference number associated with the DDS. Relevant system processes may also use verification information for controlled access or reference validation.
The reference should be connected with:
- The correct operator
- The correct HS code
- The declared quantity
- The relevant coffee lot
- The contributing plots
- The commercial invoice
- The packing list
- The customs declaration
A valid reference number does not make unrelated coffee compliant. Using the reference of another supplier, product or shipment may represent incorrect reporting or circumvention.
DDS reference in the customs declaration
The person lodging the customs declaration must include the DDS reference number or applicable declaration identifier for the imported product. The importer should therefore transmit the correct reference information to its customs representative before filing.
The customs and compliance teams should compare:
- Importer identity and EORI
- Product code
- Product description
- Country of production
- Net quantity
- Invoice and packing-list references
- DDS reference number
- Container and lot information
Differences should be resolved before submission rather than after the shipment is held for clarification.
Can one DDS cover multiple shipments?
A DDS may be referenced in more than one customs declaration where it validly covers the relevant products, quantities, production plots and due diligence assessment. The same reference should not be reused beyond the product and quantity actually covered.
Similarly, one customs declaration may include multiple DDS references where the imported consignment contains coffee covered by several valid statements.
The company should maintain a control ledger showing:
- Total quantity covered by each DDS
- Quantity allocated to each customs declaration
- Remaining unallocated quantity
- Lots and plots associated with each allocation
- Date and status of each import entry
This prevents duplicate allocation and use of a statement for quantities exceeding its actual coverage.
Can a DDS be amended or cancelled?
The operator should verify all data before submission. The ability to amend or cancel a statement may be restricted once its reference has been used in a customs declaration, another statement or a completed market transaction.
Before submission, companies should therefore confirm:
- Final product code
- Final lot composition
- Final production plots
- Final quantity
- Correct operator and EORI
- Correct country of production
- Completion of risk approval
If the commercial lot changes after submission, the compliance team should determine whether the existing DDS remains valid or whether a replacement statement is necessary.
Changes after the statement is submitted
A shipment may change because of quantity adjustments, container replacement, damaged bags, customs reclassification, removal of a lot or substitution of product. Every change should be evaluated against the DDS.
A new or revised compliance action may be needed when:
- The HS code changes.
- The quantity exceeds the amount covered.
- The country of production changes.
- New farms or plots are added.
- The export lot is replaced.
- Unknown coffee enters the shipment.
- New information changes the risk conclusion.
Administrative convenience should never be used to keep a statement attached to coffee it no longer accurately describes.
Authorised representatives
An operator may appoint an authorised representative to perform specified actions where permitted. The appointment should be documented, and the roles of the operator and representative should be clear.
The operator should define:
- Scope of authority
- Access to the Information System
- Who validates origin data
- Who approves the risk conclusion
- Who submits the DDS
- Who communicates with customs
- Who maintains supporting records
Use of a representative does not remove the operator’s responsibility for the compliance of the imported coffee.
Supporting documents are not uploaded only for formality
The core evidence may be stored in the operator’s due diligence system rather than reproduced in full inside every statement. It must nevertheless be organised, accessible and connected to the DDS reference.
A practical file structure may contain:
- Operator approval record
- Supplier contract and questionnaire
- Product and HS-code assessment
- Farmer and plot dataset
- Geolocation files
- Deforestation assessment
- Legal-production review
- Risk assessment
- Risk-mitigation evidence
- Lot and quantity reconciliation
- Shipping and customs documents
- Copy of the submitted DDS and reference
These controls can be integrated with documented coffee quality, traceability and compliance procedures.
Lot traceability supporting the DDS
The statement must relate to identifiable physical coffee. The importer should be able to trace the covered lot backwards to all production plots and forwards to the customs entry and subsequent customers.
A typical chain is:
- Production plot
- Farmer delivery
- Collector or cooperative lot
- Processing batch
- Dry-mill lot
- Warehouse lot
- Export lot
- Container
- Import customs entry
- Importer warehouse lot
- Roasting or resale batch
If several lots are combined, all inputs must remain identifiable. If one lot is divided, every child lot must retain its connection with the parent record.
Quantity reconciliation supporting the DDS
Quantity controls demonstrate that the declared coffee could realistically have originated from the identified farms and passed through the recorded supply chain.
The operator may compare:
- Mapped coffee area
- Expected farm yield
- Recorded harvest
- Delivered cherry or parchment
- Green-coffee conversion
- Processing losses
- Warehouse stock
- Export quantity
- Imported net mass
Unexplained excess volume is a warning that undocumented coffee may have entered the lot. The issue should be resolved before the DDS is approved.
Consistency between the DDS and commercial documents
The following documents should describe the same transaction:
- Purchase contract
- Commercial invoice
- Packing list
- Bill of lading
- Certificate of origin where used
- Quality certificate
- Phytosanitary or other required certificates
- DDS
- Customs declaration
Not every document contains identical fields, but shared information such as parties, product, origin, quantity and lot should not conflict.
Common DDS mistakes in coffee imports
- Submitting the statement before completing risk assessment
- Using the exporter instead of the EU operator in the operator field
- Entering an incorrect EORI number
- Selecting the wrong HS code
- Using a product description that is too general
- Declaring gross weight instead of the required net quantity
- Listing the shipping country instead of the production country
- Providing only cooperative or warehouse coordinates
- Omitting contributing farms from an aggregated lot
- Using copied or invalid coordinates
- Failing to reconcile quantities
- Using a DDS reference for unrelated coffee
- Submitting the DDS after the customs declaration
- Assuming certification automatically proves compliance
- Assuming low-risk classification removes plot-level information requirements
Warning signs for importers
An importer should pause the DDS process when:
- The exporter cannot identify all contributing farms.
- The same coordinate appears for many unrelated producers.
- The mapped area cannot support the supplied volume.
- The stated harvest dates conflict with the regional season.
- Land documents do not identify the producer or legal user.
- The lot was mixed before farms were verified.
- Traceability ends at the cooperative.
- The shipment quantity differs materially from the approved lot.
- The supplier claims that a sustainability certificate is sufficient by itself.
- The compliance team cannot reproduce the basis for the negligible-risk conclusion.
Record-retention obligations
The operator must retain records of Due Diligence Statements and the supporting due diligence information for at least five years. Records should remain accessible even when employees, brokers, suppliers or software systems change.
Retention should cover:
- Submitted DDS records
- Reference numbers
- Geolocation files
- Supplier and farm registers
- Risk assessments
- Risk-mitigation actions
- Legal-production evidence
- Deforestation-screening evidence
- Lot records
- Quantity controls
- Customs and shipping documentation
- Communications concerning corrections or new risk information
New information discovered after import
If the operator obtains new information indicating that imported coffee may not comply, it must act immediately. The response may include informing competent authorities and relevant downstream businesses, stopping distribution, isolating stock, conducting additional investigation and taking corrective action.
Examples of new information include:
- A substantiated deforestation concern
- Evidence of false coordinates
- Discovery of illegal land use
- Undeclared mixing
- A falsified supplier document
- A quantity discrepancy revealing an unknown source
The original DDS should not be treated as a permanent shield against later evidence.
Passing the reference downstream
The responsible operator must communicate the relevant DDS reference information to the downstream operators and traders receiving the coffee. Each downstream business should maintain a clear link between the coffee purchased and the reference received.
Downstream records may include:
- Supplier identity
- Purchase invoice
- Input-lot code
- DDS reference number
- Quantity received
- Processing or resale record
- Output-lot code
- Customer supplied
The reference must not be attached to products or quantities outside the scope of the original statement.
Internal approval before submission
A company should establish a documented approval process rather than allowing any user with system access to submit a DDS.
The approval may include:
- Product-classification review
- Supplier approval
- Geolocation validation
- Legal-production review
- Deforestation-screening approval
- Risk-assessment approval
- Quantity and lot reconciliation
- Customs-data comparison
- Final management authorisation
The person submitting the statement should understand the meaning of the declaration and not treat it as a routine shipping form.
Import-document checklist
- EU operator legal name confirmed
- EORI number confirmed
- HS code confirmed
- Product description confirmed
- Country of production confirmed
- Net quantity confirmed
- All production plots identified
- Geolocation validated
- Production period recorded
- Deforestation-free evidence reviewed
- Legal-production evidence reviewed
- Risk assessment completed where required
- Risk mitigation completed where necessary
- Lot composition confirmed
- Quantities reconciled
- DDS submitted
- Reference number obtained
- Reference sent to customs declarant
- Customs declaration matched with the DDS
- Records retained for at least five years
Recommended workflow for coffee importers
- Confirm the product’s EUDR scope and customs classification.
- Identify the responsible EU operator.
- Confirm the applicable EUDR application date.
- Contractually require the exporter to provide plot-level data.
- Register and validate suppliers, farms and plots.
- Collect geolocation and production periods.
- Assess deforestation-free status.
- Review legal-production evidence.
- Establish lot traceability from plots to export shipment.
- Reconcile production and shipment quantities.
- Complete risk assessment where applicable.
- Mitigate every non-negligible risk.
- Confirm the final commercial and customs data.
- Submit the DDS through the Information System.
- Obtain and record the reference number.
- Transmit the correct reference to the customs declarant.
- Verify customs clearance against the declared product and quantity.
- Pass required reference information downstream.
- Monitor for new compliance information.
- Retain the complete file for at least five years.
Commercial value of DDS-ready supply chains
A well-prepared DDS process can reduce customs delays, document disputes and buyer uncertainty. Exporters that deliver validated plot data and stable lot records may be preferred by European importers even when their coffee is not the lowest-priced offer.
DDS-ready supply programmes may include:
- Traceable commercial Robusta
- Farm-level Arabica
- Fine Robusta microlots
- Physically segregated regional lots
- Certified coffee with supporting EUDR evidence
- Private-label roasted coffee
- Documented espresso blends
- Traceable processed-coffee supply chains
Suppliers preparing coffee for European customers can review structured coffee export, traceability and documentation services.
Final assessment
The EUDR Due Diligence Statement for coffee imports is the operator’s formal declaration that the imported product has passed the required due diligence process and presents no risk or only a negligible risk of non-compliance. It must accurately identify the operator, product, quantity, production country and all contributing production plots, and its reference must be available for the customs declaration.
The DDS is only as reliable as the records behind it. Incomplete geolocation, unidentified farms, inconsistent quantities, unsupported legal claims or unknown mixing cannot be corrected merely by submitting an electronic form.
Importers should complete due diligence before customs filing, validate the final shipment against the statement and preserve the supporting evidence for regulatory checks. Businesses seeking Vietnamese green, roasted or processed coffee with defined EUDR documentation can submit a customised wholesale coffee inquiry specifying the product, origin, quantity, destination, processing method, packaging and due diligence data required.